Aug 24, 2007

Carey and I drive up to meet John, the hardwood floor installer, Greg the tile man, and check on general house progress. We found lots exterior and interior painting done, about 2/3 of the hardwood floor installed, and we walked up as the crew of twelve was finishing the exterior concrete (front walk, patio, studio porches and air conditioning pads. We were very happy.

The front walkway is drying. Next step: Brick porch and entrance

The front walkway is drying. Next step: Brick porch and entrance

The patio and path leading up to the studio

The patio and path leading up to the studio

Same thing a little later in the morning

Same thing a little later in the morning

Veranda and patio detail. The outside shower is at the left corner of the house

Veranda and patio detail. The outside shower is at the left corner of the house

The famous draw pull from Random. The first part of the house that was purchased

The famous draw pull from Random. The first part of the house that was purchased

Foyer floor, looking to the master suite

Foyer floor, looking to the master suite

The library book shelves and fireplace. The fireplace surround is in the garage

The library book shelves and fireplace. The fireplace surround is in the garage

Master floor. Closets in the foreground. Tile around the fireplace to be installed this week.

Master floor. Closets in the foreground. Tile around the fireplace to be installed this week.

Same picture. Closet doors closed, with Flash

Same picture. Closet doors closed, with Flash

L1030368

L1030368

Carey admires aristotle

Carey admires aristotle

Taking charge of the studio

Taking charge of the studio

L1030376

L1030376

L1030377

L1030377

L1030378

L1030378

L1030383

L1030383

L1030379

L1030379

L1030380

L1030380

L1030384

L1030384

L1030388

L1030388

L1030389

L1030389

L1030390

L1030390

L1030400

L1030400

L1030401

L1030401

The wiring closet awaits termination

The wiring closet awaits termination

All contents © Copyright 2007-2008  Jeffrey Feldstein